Correspondence
Full details of auction parameters and interconnector de-rating factors
Published 22 July 2024
Table 1: Auction parameters
T-1 Auction for delivery in 2025/26 | T-4 Auction for delivery in 2028/29 | |
---|---|---|
Auction target capacity | 6.5 GW | 44.0 GW |
Demand curve: minimum capacity at price cap | 5.5 GW | 42.5 GW |
Demand curve: maximum capacity at 拢0 | 7.5 GW | 45.5GW |
Reliability Standard | 3 hours LOLE | 3 hours LOLE |
Net CONE | 拢49/办奥/测谤 | 拢49/办奥/测谤 |
Price Cap | 拢75/办奥/测谤 | 拢75/办奥/测谤 |
Price Taker Threshold | 拢25/办奥/测谤 | 拢25/办奥/测谤 |
15-year agreement threshold | N/A[footnote 1] | 拢340/办奥[footnote 2] |
3-year agreement threshold | N/A[footnote 1] | 拢170/办奥[footnote 2] |
Indexation | N/A | 2023/24 |
Table 2: Interconnector de-rating factors
T-1 auction 2025/26 Delivery Year | T-1 auction 2025/26 Delivery Year | T-4 auction 2028/29 Delivery Year | T-4 auction 2028/29 Delivery Year | ||
---|---|---|---|---|---|
Interconnector | Connection capacity (GW) | ESO range (%) | DRF (%) | ESO range (%) | DRF (%) |
IFA (France) | 2 | - | - | 25-77 | 62 |
IFA2 (France) | 1.1 | - | - | 25-77 | 63 |
ElecLink (France) | 1 | - | - | 25-77 | 67 |
BritNed (Netherlands) | 1.2 | - | - | 57-92 | 66 |
Moyle (Northern Ireland) | 0.5 | - | - | 6-78 | 54 |
EWIC (Republic of Ireland) | 0.5 | - | - | 6-78 | 54 |
Greenlink (Republic of Ireland) | 0.5 | 12-58 | 49 | 6-78 | 54 |
NemoLink (Belgium) | 1 | - | - | 48-88 | 67 |
NSL (Norway) | 1.4 | - | - | 71-96 | 75 |
VikingLink (Denmark) | 1.4 | - | - | 60-92 | 60 |
Neuconnect (Germany) | 1.4 | - | - | 55-90 | 60 |