Guidance

Non-pathogen scheme: sample schedule

This external quality assessment (EQA) scheme is suitable for laboratories located on production sites where the introduction of pathogens may be inadvisable.

This publication was withdrawn on

This content is no longer up-to-date. For the most recent information, see the聽聽(FEPTU) website.

Documents

Details

This non-pathogen scheme sample schedule is for the period 1 April 2022 to 31 March 2023.

Updates to this page

Published 17 January 2014
Last updated 10 March 2022
  1. Updated for the period 1 April 2022 to 31 March 2023.

  2. Updated scheme sample schedule for period 1 April 2021 to 31 March 2022.

  3. Updated sample schedule 1 July 2020 to 31 March 2021.

  4. Added schedule for period 1 April 2019 to 31 March 2020.

  5. Added 'Non-pathogen scheme: sample schedule 1 April 2018 to 31 March 2019'.

  6. Added non pathogen scheme: sample schedule 1 April 2017 to 31 March 2018.

  7. Updated sample schedule for 1 April 2016 to 31 March 2017.

  8. Updated sample schedule 1 April 2015 to 31 March 2016.

  9. First published.

Sign up for emails or print this page